Bilbao · +34 944 243 344 · Madrid · +34 911 138 989 · whssl@whssl.com LinkedIn ↗ · PVS-E-013 accredited
CSSdiscipline · 01 / 06

health & safety
coordination.

Construction-sector preventive role regulated by Royal Decree 1627/97. We ensure compliance with minimum H&S provisions in design and execution phases, with full documentary traceability.

Coordination team on site
SITE · BIZKAIA 2024
+25
years coordinating
health & safety
RD 1627/97
specific
regulatory framework
500+
sites coordinated
since 2000
01.

service scope.

We assume H&S coordination in design phase and/or execution. The role includes drafting or approving the H&S plan, coordinating contractor activities, supervising on-site compliance, controlling preventive documentation, and tracking the incident log through to the final certificate.

01

health & safety plan.

Approval or revision of the contractor plan, aligned with the H&S study and project specifics.

02

incident log.

Opening, custody and follow-up of the on-site incident log. Communication to labour inspection when applicable.

03

coordination minutes.

Appointment, plan approval and periodic coordination meeting minutes with all stakeholders.

04

monthly reports.

Reporting to the developer with detected issues, corrective measures and compliance status.

05

site visits.

Periodic inspections at a frequency adapted to risk level. Photographic documentation and non-conformity registry.

06

final certificate.

Coordinator final certificate with full preventive documentation archived for administration and insurer.

02.

applicable
regulatory framework.

RD 1627/1997
Minimum H&S provisions for construction works
Law 31/1995
Occupational Risk Prevention
RD 39/1997
Prevention Services Regulation
RD 1109/2007
Subcontracting in the construction sector
RD 171/2004
Coordination of business activities
CTE-DB-SUA
Use safety and accessibility
03.

when to engage us.

case · 01

before site start.

Developer is required to appoint a coordinator in execution phase before works begin when multiple companies intervene.

case · 02

coordinator change.

Replacement due to leave, resignation or change of approach. Acceptance of current log and plan with documentation audit.

case · 03

restructuring.

Mid-project changes, scope expansion, critical subcontractor onboarding or work on existing structure.

04.

related
services.

do you have a
health & safety coordination project?.

A 20-minute call to assess scope, schedule and fees.